Salesforce Implementation Checklist: 40 Things to Settle Before Go-Live

A practical Salesforce implementation checklist for teams planning a rollout or a major re-implementation. Work through it with your admin, your executive sponsor, and your implementation partner. Anything you cannot tick off is a risk worth naming early.

Download the printable PDF checklist

How to use this checklist

The 40 items below are grouped into seven areas, roughly in the order a project meets them. Most projects run several areas in parallel, so treat the order as a guide rather than a gate. For each item, write down one owner by name and a date. An item owned by “the team” is an item nobody owns.

Review the open items at every steering meeting. When something cannot be closed, record why and what the risk is if go-live goes ahead without it. That record is what lets an executive sponsor make a clear call instead of discovering the gap in week one of hypercare.

Implementation methodology: phases, owners and exit criteria

Whatever implementation methodology your partner uses, agile sprints or a phased waterfall plan, the same five phases appear in some form. Agree the exit criteria for each phase before it starts.

Phase What happens Main owner Exit criteria
Discover Goals, scope, current processes, data sources and integrations are documented. Executive sponsor and project owner Signed-off scope, success metrics and a phase 1 backlog.
Design Data model, security model, automation and integration design, page layouts by role. Solution architect with the admin Design documents reviewed by the business owners of each process.
Build Configuration, code, integrations and trial data loads in sandboxes, in short iterations. Implementation partner or internal developers Every backlog item demonstrated and accepted by its business owner.
Test and train System testing, user acceptance testing, a full trial migration, role-based training. Project owner with named end users UAT sign-off, reconciled trial migration, trained users.
Deploy and hypercare Cutover, final data load, go-live support and a weekly adoption review. Admin and hypercare owner Open issues triaged, adoption targets met, handover to business-as-usual support.

1. Goals and scope

  • Write down the top 3 business outcomes (not features)
  • Name an executive sponsor and a day-to-day owner
  • Agree on what is out of scope for phase 1
  • Define success metrics and how you will measure them
  • Agree on the budget range and the change-control process

Scope creep usually starts with a reasonable request in week six. A written change-control process, even a one-page one, turns those requests into decisions about time and budget rather than quiet additions.

2. Data

  • Inventory data sources (spreadsheets, old CRM, ERP, marketing tool)
  • Decide what to migrate and what to archive
  • Clean duplicates before migration, not after
  • Map every source field to a Salesforce field
  • Define a unique key for each object to prevent duplicates
  • Run at least one full test migration and compare record counts
  • Plan a rollback if the cutover fails

Data migration checks that catch problems early

Record counts are the first check, not the only one. After each trial load, compare totals that matter to the business, such as open pipeline value or open cases by status, against the source system. Spot-check twenty records per object by hand, including owners, related records and picklist values. Load in dependency order (users, accounts, contacts, then opportunities and activities) and keep the external ID from the source system on every record, so a failed batch can be reloaded without creating duplicates.

3. Requirements gathering, process and design

  • Document the current sales, service, and handoff processes
  • Agree on definitions for lead, account, contact, and opportunity
  • Design page layouts per role, not one layout for everyone
  • Pick stages and required fields that sales will actually fill in
  • Decide where Flow, validation rules, or Apex fit (declarative first)

Good requirements gathering starts with how work is done today, not with a feature list. Run short workshops per team, walk through real records from the current system, and write each requirement as a user story with a named business owner who will accept it. A requirement nobody will sign off is usually a requirement nobody needs.

4. Security and access

  • Define roles, profiles, and permission sets
  • Set sharing rules and field-level security
  • Turn on multi-factor authentication
  • Plan sandbox access and who can deploy

5. Integrations

  • List every system that must connect (ERP, email, marketing, billing)
  • Choose native connector, middleware, or API for each
  • Decide sync direction and who owns each field
  • Plan error alerts for failed syncs

Sandbox strategy

A simple sandbox strategy prevents two common failures: building in production, and testing against data that looks nothing like the real thing. Salesforce offers four sandbox types; most implementations use at least two.

Sandbox type What it copies Refresh interval Typical use
Developer Configuration only, small data storage Once a day Individual build work and unit testing
Developer Pro Configuration only, more storage Once a day Larger builds, integration development
Partial Copy Configuration plus a sample of data chosen by a template Every 5 days System testing, UAT and training
Full Configuration and all data Every 29 days Trial migrations, performance tests and final UAT

Decide who can deploy to each sandbox and to production, and move changes along one path (for example, developer sandbox to a shared test sandbox to production) rather than building in several places. Mask personal data in sandboxes that hold copies of production.

6. Testing and training

  • Write test cases from real user stories
  • Run user acceptance testing with actual end users
  • Test reports and dashboards against known numbers
  • Train by role, with short recorded sessions
  • Create a one-page quick-start guide per team

7. Go-live and after

  • Set a cutover date that avoids quarter-end
  • Freeze changes in the old system during cutover
  • Assign a hypercare owner for the first 30 days
  • Set up an issue log and a weekly triage
  • Check adoption (logins, records created) weekly
  • Review data quality at 30, 60, and 90 days
  • Plan a release calendar for future changes
  • Schedule a post-launch retrospective
  • Document admin runbooks (backups, user onboarding and offboarding)
  • Revisit the roadmap at 90 days

Cutover

Write the cutover plan as a timed run sheet: when the old system is frozen, when the final extract runs, when each object loads, who checks the results and who makes the go or no-go call. Rehearse it at least once against a full sandbox, and keep the rollback plan from the data section within reach.

Hypercare: the first 30 days

Expect a burst of questions and small fixes in the first two weeks. Keep the project team available, log every issue with an owner and a severity, and triage the log daily in week one and weekly after that. Watch adoption numbers by team rather than in total, because one team that has gone back to spreadsheets is easy to miss in an average. Close hypercare formally, with the open items handed to whoever runs the org day to day.

Getting help with your implementation

If you would rather not run this list alone, our Salesforce implementation services cover each phase, from discovery and requirements gathering to cutover and hypercare.

Planning a Salesforce rollout or a clean-up of an existing org? Talk to the Ashapura Softech team.